Energy and Chemical

Industry


Energy and Chemical Industry

Zhenhai Refining & Chemical


Zhenhai Refining & Chemical’s 1-million-ton-per-year ethylene project is the first in China to directly achieve an annual production capacity of one million tons. The project has received high-level attention from both the Zhejiang Provincial Party Committee and Sinopec headquarters; at the time, Xi Jinping, then Secretary of the Zhejiang Provincial Party Committee, personally presided over the groundbreaking ceremony. This milestone laid the foundation for Zhenhai Refining & Chemical to become the industry leader in both profitability and refining scale. Our company was primarily responsible for constructing the pile foundations for the ethylene cracking unit, the district utility tunnel, as well as the external process heating pipelines for propylene oxide, styrene, and the entire plant, completing a total of 90,000 cubic meters of piling work.

Tianjin Commercial Storage


The Sinopec Tianjin Crude Oil Commercial Storage Facility, one of the largest storage complexes in North China, is an important crude oil storage project for Sinopec in the Beijing–Tianjin–Hebei region and represents the company’s single‑phase, largest‑scale domestic inventory‑construction initiative. The company has successfully completed the fabrication and installation of pile foundations for Sections 5, as well as portions of Sections 1 and 2, totaling 55,000 cubic meters of precast concrete square piles fabricated and installed on site, earning high praise from the Sinopec Pipeline Bureau.

Tianjin National Reserve


The Sinopec Tianjin National Crude Oil Storage Facility, located in the Binhai Development Zone of Tianjin and adjacent to the Bohai Sea, is one of the largest crude oil storage projects in North China. Commissioned by the National Development and Reform Commission, it is a major national strategic oil reserve complex managed and constructed by Sinopec. The project involves the simultaneous construction of 32 100,000-cubic-meter crude oil storage tanks, playing a crucial role in safeguarding the nation’s strategic oil reserves. Through meticulous planning and scientifically sound execution, our company completed, on schedule, the fabrication and installation of 7,500 concrete bored piles totaling 63,000 cubic meters for Section III in just 190 days, with all results fully meeting design specifications.

Wison Offshore Engineering Equipment Base Project


The Wison Offshore Engineering Equipment Base project is located at No. 18 Weihai Avenue, Lüsigang Development Zone, Qidong City, Nantong, Jiangsu Province. Our company has completed approximately 200,000 meters of pile‑foundation construction across two contract sections.

Puxijing


The New Energy‑Specific Polyolefin Specialty Materials Project is located on Plot C3 of the Shanghai Chemical Industry Park. It is being developed through a new investment by Puxijing New Materials (Shanghai) Co., Ltd. Our company undertook the pile foundation works for Phases I and II, which commenced on April 23, 2024, and were completed in September 2024, with a total of 210,000 meters of prestressed pipe piles and square piles installed.

Anhui Methanol Project


The Anhui Huayi Coal‑Based Polygeneration Fine Chemicals Project, a large‑scale integrated coal‑chemical facility with an annual capacity of 600,000 tons of methanol and 350,000 tons of acetic acid, is one of the super‑large projects through which Shanghai’s state‑owned Huayi Group has responded to the national strategic layout, entered Anhui Province, and joined the Yangtze River‑side industrial chain. The foundation system employs precast concrete pipe piles, totaling over 600,000 linear meters, and has garnered attention from leaders at all levels in both Shanghai and Anhui Province. Guided by the company’s meticulous planning and scientifically sound construction approach, the foundation works were completed with outstanding performance, earning the National Quality Engineering Gold Award for the 2012–2013 period.

Shipbuilding

industry


Shipbuilding industry

Photo of the Changxing Shipbuilding Base


The Shanghai Changxing Shipbuilding Base, located on Changxing Island in Shanghai, is a super‑large shipyard designed, planned, and built entirely in China. It represents a major milestone in China’s journey toward becoming a global leader in shipbuilding. Among its facilities, Dock No. 3—measuring 538 meters in length and 128 meters in width—is the largest dry dock in China, capable of constructing vessels and offshore platforms of every type worldwide. At the Shanghai Changxing Shipbuilding Base, all pile foundations for Docks Nos. 1, 2, and 3, as well as for the onshore areas, were constructed using a variety of pile types, including precast concrete square piles, tubular piles, CAZ steel sheet piles, and concrete sheet piles. The total pile‑foundation work amounted to 2.6 million linear meters, completed over a 30‑month construction period, with a single-phase deployment of more than 50 pieces of construction and transportation equipment. We successfully overcame numerous challenges, such as driving 32‑meter‑long Larsen steel sheet piles, installing ultra‑deep pile extensions reaching 25 meters into the pump house of the dock, and enduring the impact of Typhoon Matsa.

Municipal

transportation


Municipal Transportation

Civil

buildings


Civil building

Senlan Plot A4-2


The Senlan International Community Commercial Building A4‑2 project is located in the Senlan area of Shanghai’s Waigaoqiao Free Trade Zone. The main structure comprises five above‑ground floors, housing commercial spaces, community services, and sports facilities, while the three underground levels accommodate two levels of retail space and a three‑level parking garage. For this project, static‑pressure pipe piles are used for the two‑story section, whereas bored cast‑in‑place piles are employed in the three‑story section. The excavation pit covers an area of 33,118 m², with depths ranging from 11.3 to 16.65 m. Sequential full‑pit excavation is adopted. In the second basement level, the retaining system consists of row piles combined with triple‑axis jet grouting cutoff walls and two horizontal concrete bracing members. In the third basement level, the design features a diaphragm wall (with rubber waterstop joints), triple‑axis jet grouting wall reinforcement, and three horizontal concrete bracing members. In areas with elevation differences, the retaining system utilizes bored cast‑in‑place piles together with an ultra‑long triple‑axis cement‑soil jet grouting cutoff wall.

New Commercial and Residential Development on Senlan Island


The new residential and commercial development on Senlan Island is located in the Senlan area of Gaoxing Town, Pudong New Area. It covers a land area of 226,000 square meters, with a total floor area of approximately 272,000 square meters—156,000 square meters underground and 116,000 square meters above ground—and is divided into nine parcels. Our company is responsible for pile foundation and excavation shoring works. The pile foundations consist of pre-stressed hollow square piles, totaling about 400,000 linear meters, while the excavation shoring system primarily comprises jet-grouting diaphragm walls, internal steel sections, and localized diagonal bracing.

CapitaLand Senlan Phase II


The R&F Senlan Bay project is Shanghai’s latest high-end residential development, situated at the heart of the city’s newly planned Senlan district. To date, it has installed a cumulative 150,000 linear meters of PHC‑AB500 and PHC‑AB400 pipe piles, while the company has deployed six sets of imported DH408 and DH508 crawler‑type pile‑driving rigs operating in parallel, laying a solid foundation for both quality and schedule. In addition, the company has undertaken large-scale, premium real estate projects such as R&F West Suburb, R&F East Suburb, and Greeland Property.

Qiantan Sifang City


The Sifangcheng Project is located in the Qiantan area of Sanlin Town, Pudong New Area, covering a total land area of 62,019 m² and a total floor area of approximately 410,396 m², with mixed-use functions for office and commercial purposes. The above‑ground portion comprises 11 separate buildings, interconnected by steel‑structure skybridges; the total above‑ground floor area is about 266,870 m², with the tallest building reaching a height of 52.5 m and rising 11 stories above ground. The underground components are linked via subterranean passageways connecting basements beneath four distinct plots. Two of these plots feature three‑level basements, supported by a retaining system comprising slurry walls, triple‑axis trench wall reinforcement, a TRD cutoff wall, and three concrete support struts. The remaining two plots have two‑level basements, utilizing bored piles, a TRD cutoff wall, and two concrete support struts. The underground passageways interconnect the first, second, and third basement levels of each plot, with a combined total underground floor area of approximately 143,526 m². The first basement level accommodates the staff cafeteria, parking, and mechanical/electrical rooms, while the second and third basement levels house parking and equipment spaces. Pedestrian overpasses on the east and west sides of the site provide connectivity to adjacent parcels. Our company is responsible for the project’s pile foundation and excavation shoring works.

Lingang Ice and Snow Star


Shanghai Lingang Ice and Snow Star is located in Nanhui New City, Shanghai’s New Area. The project employs two types of pile foundations: precast pipe piles and bored cast-in-place piles. In the basement’s general areas, the bottom slab elevation is –7.80 m, with a slab thickness of 700 mm and a leveling layer thickness of 150 mm. In the southeast corner—where the boutique hotel is situated—and in the northeast corner—within the northern resort‑hotel zone—the typical excavation depth is 6.45 m. In certain localized areas of the northwest corner, the typical excavation depth is 7.75 m. Sump pits are 1.50 m deep, elevator shafts are 1.50 m deep, and elevator fire‑fighting sump pits are 3.00 m deep. For the basement area of this excavation, the retaining structure consists of bored cast-in-place piles combined with a single‑row triple‑axis cement‑soil mixing pile cutoff wall, with an internal reinforced concrete support system. The cutoff wall is constructed using ∅850@600 triple‑axis cement‑soil mixing piles. Within the excavation, reinforcement is achieved through 700@500 double‑axis mixing piles supplemented by compaction grouting.

Dynamic compaction

project


Dynamic Compaction Project

Land Foundation Treatment Project for the China Shipping Jiangsu Shipbuilding Base


The land‑based foundation treatment project at the China Shipping Jiangsu Shipbuilding Base covers an area of 1 million square meters. The project owner is China Shipping Industry (Jiangsu) Co., Ltd., and the total construction period is 43 days. Due to site constraints and the surrounding environment, various construction techniques were employed in different zones, including light wellpoint dewatering combined with dynamic compaction, impact rolling, vibro‑compaction, and plastic drainage boards.

Shenhua Dynamic Compaction Project


Construction of the full‑plant dynamic compaction works for the Shenhua Ningmei 4-million‑ton‑per‑year coal indirect liquefaction project (Section II) is being undertaken by the client, Shenhua Ningxia Coal Industry Group Co., Ltd. The project site is located in the Ningdong Coal Chemical Base (Area B6), Ningxia Hui Autonomous Region. The total area of ground improvement amounts to approximately 386,900 square meters, with dynamic compaction energy levels of 4,000 kN·m, 6,000 kN·m, 8,000 kN·m, 10,000 kN·m, and 12,000 kN·m. The overall construction period is 60 days.

Huizhou Dynamic Compaction Project


Section 1 of the dynamic compaction treatment for the D1D2 plot in Phase II of the Huizhou Refining and Chemical Project. Construction entity: Huizhou Refining and Chemical Branch of CNOOC Petroleum Refining & Chemical Co., Ltd. Project location: Daya Bay Petrochemical Industrial Zone, Huizhou City, Guangdong Province. The scope includes a 8,000 kN·m‑energy‑level dynamic compaction area of 133,146 m², a 12,000 kN·m‑energy‑level dynamic compaction area of 195,828 m², and the placement of 440,981 m³ of crushed stone fill. The total contract duration is 181 calendar days.

Dongying Port Foundation Reinforcement Project


The foundation reinforcement project within the oil storage area of the Dongying Port Project, undertaken by Dongying Port Co., Ltd., covers a total ground‑treatment area of approximately 1.0114 million square meters and employs the dual‑control dynamic consolidation method. Under operating conditions as low as −5°C, our company utilized electroosmotic wellpoint dewatering and plastic drainage‑board‑reinforced compaction, among other construction techniques, to ensure both schedule adherence and high‑quality results.

Chongqing Chemical & Pharmaceutical MDI Integrated Project


Section C of the site pre‑treatment (dynamic compaction) works for the Chongqing MDI Integrated Project is a development undertaken by Chongqing Chemical & Pharmaceutical Holdings (Group) Co., Ltd. in the Changshou Economic and Technological Development Zone, Chongqing. The total area of ground improvement amounts to approximately 404,100 square meters, with a contract duration of 90 days. The company has deployed 15 sets of dynamic compaction equipment, each delivering an energy level of 4,000–8,000 kN·m.